Case Study 01

Seismic Retrofit & BIM Integration for Heritage Tower

A landmark 1920s commercial tower required a comprehensive structural upgrade to meet modern seismic codes without compromising its historic facade. Our team delivered a full-scale retrofit using advanced BIM modeling to coordinate new steel reinforcement within the existing masonry shell.

The Challenge

The building's original unreinforced masonry structure posed a significant collapse risk in a seismic event. The project demanded a solution that preserved architectural heritage, minimized tenant disruption, and adhered to a strict municipal preservation timeline.

Our Solution

We developed a hybrid structural system. A concealed internal steel moment frame was designed using detailed 3D BIM models, which allowed for precise fabrication and installation sequencing. This was complemented by base isolation technology at the foundation level to dampen lateral forces.

Process & Technology

  • Laser scanning and point-cloud modeling of the existing structure.
  • Collaborative 4D/5D BIM for clash detection and construction phasing.
  • Finite Element Analysis (FEA) to simulate seismic performance post-retrofit.
  • Prefabrication of major steel components off-site to reduce on-site time by 40%.

Key Results

98%
Reduction in seismic drift
A+
Updated safety rating
15%
Under budget
0
Facade alterations

Project Data

  • Client: Private Heritage Trust
  • Location: סמטאת תאומים 404
  • Scope: Full Structural Retrofit
  • Duration: 18 Months
  • Team Lead: Dr. A. Khan, PE

Our Engineering Process

A systematic, safety-first approach from initial concept to final construction documentation. Discover how Zan-Khan delivers structural integrity.

01

Initial Consultation & Site Analysis

We begin with a comprehensive review of your project requirements and a detailed geotechnical assessment of the construction site.

02

Advanced Load-Bearing Modeling

Our core phase involves creating precise digital models to simulate stresses, loads, and potential failure points under various conditions.

03

BIM Integration & Blueprint Finalization

We integrate all data into a unified Building Information Model, producing actionable, code-compliant structural blueprints for construction teams.

Ready to discuss your infrastructure project? Contact our engineering team.